Traditional Data Center |
Micro Data Center Smart Rack |
| •Construction time |
1-2 months |
Within 7 days |
| •Space |
Subsystems such as UPS, air conditioners, cabinets, etc. need to occupy space independently |
Modular rack-mounted deployment, highly integrated, reducing the area of the computer room |
| •Integration |
Multiple suppliers, product independent construction, independent management |
One-stop supply, pre-integration, unified management |
| •Compatibility |
Multi-brand product integration, complex debugging, poor compatibility |
Factory pre-integration, pre-commissioning, overall testing, high compatibility |
| •Energy Saving |
PUE value is 2.0~3.0, low cooling capacity utilization |
PUE value≤1.2,energy save more than 50% |
| •Stability |
Easy to accumulate dust, hinder stable operation and reduce equipment life |
Operation in a fully enclosed cabinet, high cleanliness, stable operation |
| •After-sales |
Multiple maintenance, unclear responsibility for relevance issues |
Unified maintenance, multi-level maintenance program |